Four things decide it: size, ground, the grid and the title. These are the checks solar companies make before they lease.
Size
Large solar farms generally need 100 to 1,000 acres (SolarQuarter, Mar 2026). A planning figure used in Malaysia is about 4.8 acres for each megawatt (ISIS CERT, 2026), so a 100 MW farm needs roughly 480 acres.
Under 100 acres? Neighbours can join land into one block. One lease can cover several titles.
Ground
Flat or gently sloping, with low flood risk and no wetland (SolarQuarter). Planning guidance prefers industrial land, old mining land and lower-grade farm land. Paddy land, food parks and sensitive areas are restricted (ISIS CERT). The Kedah lease is on an oil palm plantation company's land.
The grid
A farm has to send its power into a main TNB substation. The closer the land is, the cheaper the line. One solar builder calls land within about 5 km of a substation ideal (Trexon).
The title
A clear title, free to lease for 20 to 25 years. If the land is charged to a bank or held by several heirs, tell us: it changes who must agree. Rules on land use and title conversion differ by state (ISIS CERT).
The sun
On the peninsula, the north-west coast, from Perlis and Kedah down to Penang, gets the most sun. The darker the map, the more power a panel makes in a year.